All projects

Civil Engineering

Enfield New Build Development

JMS Civils delivered a SuDS report and drainage strategy for a new build development in Enfield, London, involving two residential units and modifications to an existing...

Location

Enfield, London

Commissioner
Drainage/SuDs

JMS Civils delivered a SuDS report and drainage strategy for a new build development in Enfield, London, involving two residential units and modifications to an existing property.

The design featured permeable paving and rainwater harvesting, aligned with local regulations and the London Plan. To manage water flow, a system limiting outflow to 0.5l/s was implemented using advanced filtration and shallow, cellular storage.

Close collaboration with the Lead Local Flood Authority (LLFA) was crucial, securing necessary approvals and ensuring compliance with stringent environmental standards.

SuDS Strategy ReportsDrainagePermeable PavingSuDSCivil EngineeringInfrastructureLondon

Start a conversation

Got a project in mind?

Bring us in early for clear structural and civil engineering advice, from feasibility to detailed design and delivery.

Contact JMS